Your G99 is stuck. How much is that costing you right now?
Six fields. One honest number. Tied-up deposits, cancellation risk, and the referrals that quietly die when a homeowner waits 16 weeks for an answer.
Built by someone who talks to installers every day, not by a DNO consultant.
Tell us about your stuck jobs.
Numbers stay on your screen. Nothing is sent unless you choose to email yourself the result.
£13,700
tied up + at risk across your stuck queue right now.
On track16 weeks stuck · typical is 32
You're inside the typical NIE window for this size band. Nothing to unblock yet — but the £ tied up in deposits is real.
NI grid is the worst-affected in the UK — published queue length + capacity studies on most >50 kW jobs.
Email me this number
We'll send the breakdown so you've got it on record.
Human address. No nurture sequence. Unsubscribe any time.
Three lines. No stretch.
Deposits × jobs stuck. Real cash you've already taken that you can't recognise as revenue until DNO signs off.
Homeowner cancellation probability rises sharply after week 12. We apply that rate to your job value × a 10% margin assumption.
A stuck job that goes silent for >3 months kills around half a future referral on average. Multiplied across your live queue, this is usually the biggest number.
Numbers are directional, not financial advice. We tune them per-DNO from published SLAs and current installer feedback. Margin and referral assumptions are conservative.
The Grid Unblocker.
It's install-day peace-of-mind for the office: a fortnightly queue-position email your homeowner actually opens, an escalation route into your DNO that doesn't depend on you remembering to chase, and a single dashboard so the office manager can answer "where are we?" in 30 seconds without finding you on a roof.
Priced against the bleed it stops, not against our cost. If the number above is < £15k a year, we'll tell you on the call.